Freddie Takes The 5th!

Interim City Manager David Harden finally coughed up a copy of the Investigative Report on who knew what when and who talked to who else about the berm deletion.
Pretty entertaining reading………………………………

i know nothing

 
Scroll Window 5 Pages
[google-drive-embed url=”https://docs.google.com/file/d/0B5B9MyuH07RaTDZITWdEY3Mxd1E/preview?usp=drivesdk” title=”Freddie Takes The 5th.pdf” icon=”https://ssl.gstatic.com/docs/doclist/images/icon_12_pdf_list.png” width=”100%” height=”800″ style=”embed”]

10 thoughts on “Freddie Takes The 5th!

  • April 10, 2015 at 9:25 pm
    Permalink

    Pat, i don’t see the 5 page report on your web site. Also the e mail I sent to you came back to me that your e mail address box is full. — hank

    Reply
  • April 11, 2015 at 6:07 am
    Permalink

    Maybe we should send Fred to Stalag 17 so Schultz could beat the truth out of him.
    Here’s a guy who definitely should be fired or do the decent thing and retire. If he knows nothing, nothing then what do we need him for, especially since he is receiving a six figure salary? He knows PLENTY.

    Reply
  • April 11, 2015 at 6:20 am
    Permalink

    To Ted Noftall and Citizens for a Better Port Orange. Please don’t let this request for Fred Griffins archived Emails slide. They will probably produce some interesting information…..unless of course they suddenly disappear which often happens in Port Orange. He was the city engineer involved in this project and definitely knows who is responsible for deleting the berm.Don’t let him lie his way out of this one.

    Reply
    • April 11, 2015 at 8:49 am
      Permalink

      Freddie is a useful idiot for sure.
      Green and QLH kept him around all these years because he was larcenous enough to place the City rubber stamp of approval on their misdeeds over and over again for the few crumbs they left on the table for him to gobble up..
      The question is whether he is stupid enough to take the fall for Green and QLH and trust that they will intervene to save his worthless carcass one more time.
      He is already banned from Council Chambers for life for his lying performance regarding the filter for the reclaimed lakes and Andy Neff doesn’t want to be in the same building with him so is Freddies next spot going to be on the street or a desk in the back of the warehouse.
      BTW does anyone think it was a coincidence that Mayor Green had the reclaimed water line going to his property on Jackson Street cut and capped last week.
      Looks more and more like Ted and the Citizens for a Better Port Orange are slowly showing these taxpayer rustlers for what they are and in 2016 they will be showing them the door.

      Reply
      • April 11, 2015 at 1:26 pm
        Permalink

        Thanks Fly on the Wall. Interesting bit of info on the Mayor cutting the line of reclaimed water to his property and capping it. If every improvement he’s done to his property compliments of the City fo Port Orange was revealed he’d be behind bars wearing an orange jumpsuit. What goes around comes around Mr. Green Jeans. The Jig is up.

        Reply
        • April 12, 2015 at 10:19 am
          Permalink

          So why did Mayor Green Jeans have the reclaimed water line to his property on Jackson St cut and capped last week ??

          Reply
  • April 11, 2015 at 7:36 am
    Permalink

    Ted was wrong calling Freddie ” Peg leg “. He should have called him ” Peg Head ” Freddie is a total idiot, and a payroll thief to boot. The $ 33,000 they ‘ pegged ‘ him with stealing through fraudulent payroll time cards is what he was referring to when he said answering questions the last time cost him $ 27,000

    Reply
  • April 11, 2015 at 10:24 am
    Permalink

    Totally unacceptable! The project manager knows nothing about the berm. I think not. Hell he doesn’t even know who his supervisor is. What a joke! The mayor spoke at a council meeting like an expert and referenced the difficulty in obtaining private property to build the berm. He even said he spoke to the land owner. Fast forward and now he knows nothing. The city has half a dozen engineers making 6 digit income and are useless. What have they ever designed? All we do is hire consultants and implement nothing. A secretary could call a consultant no need for overpaid engineers if we don’t use them. The new Public Works Engineer is right on board. He said we need to hire a professional to evaluate and design a post on one of our roadways. Here save yourself a phone call. Go to http://www.coralsales.com. Take a look at the trinity CASS cable guard rail. Problem solved. How many city engineers does it take to design a post to put in the ground? None they would need a consultant, a design engineer, and someone to dig the hole. It’s time for CHANGE and accountability. If this berm investigation is accepted shame on all.

    Reply
  • April 11, 2015 at 11:49 am
    Permalink

    Perhaps Fred’s wife will get up at the next council meeting and defend him but she’s going to have a hard time explaining why our city engineer knows nothing.

    Reply

Leave a Reply

Your email address will not be published.